The project is located in the North Cotabato and Maguindanao areas, which are potential rice baskets in Mindanao, and will irrigate almost 10,000 hectares of land in 56 conflict-affected areas. Intended to contribute to sustained peace and order, it will cover the construction of three major service areas, which are in upper and lower Malitubog, and the Pagalungan extension area. In 2016, NIA proposed a change in project cost and scope. The change includes an increase in the design area and a decrease in total cost from the NEDA Board-approved PhP7.0 billion in 2010 to PhP5.4 billion.
No progress report.