The DPWH requested for a 24-month loan validity extension and implementation schedule and change of scope of the project as follows: a. Unpaved section: decrease from 14.872km to 11.30km b. Simora Bridge: increase from 140 lm to 161 lm c. Jangtud Bridge: increase from 30lm to 31lm d. Replacement of Pinaculan Bridge (50lm)with Jangtud 2 Bridge (69 lm)
No progress report.